| Home |
7.3 Maintaining the BC Plan |
Prev | Next |
|
The co-ordination and scheduling of plan documentation maintenance is the responsibility of the BC co-ordinator. Once or twice per year, (or more frequently, if required, for specific sections of the plan), the co-ordinator should circulate the MASTER PLAN to all recovery team managers and leaders, for update. Plan issue and version number control must be observed and linked to the distribution procedures. |
|
|
| Prev | Next |
Copyright ©2002 Michael Bews Associates. All Rights Reserved.